falsework In A Sentence
Learn how to use falsework in a sentence and make better sentences with `falsework` by reading falsework sentence examples.
- Falsework for this span, as mentioned, had been driven from the north end.
- In the context of concrete construction, the falsework supports the "'shuttering "'molds.
- The old piers would still be used, but the falsework was entirely removed.
- Winds blew two people off of a high falsework, killing both.
- Arch bridge can be constructed over a falsework , or temporary scaffolding.
- The falsework for the first span was in position, and with the exception of the erecting traveler all was ready to proceed with the erection of the first span.
- When high waves threatened the falsework foundation, construction was halted for a short time until winter storms abated.
- This paper discusses the combination of composite falsework and the application in construction firstly, and then analysis the cause of scaffolding collapse accident occurred at home and abroad.
- By researching the system cable, falsework, back anchor and so on, the author reaches the point for practical use.
- It took two months to construct the falsework alone.
- The suspension design was chosen to address the steep-walled canyon at the crossing, which required a single span with no temporary falsework.
- Northern columns, falsework, and formwork ( westbound to tunnel upper deck ).
- The article introduces the basic structure, application range and technics principles of the integer electromotion falsework.
- Acrows Ltd, makers of falsework, built premises to the east of the town and became a significant employer and economic influence in the area.
- After curing and any tenon tensioning, wedges will be removed and forms and falsework disassembled.
- This avoided the use of falsework and avoided impeding river traffic.
- The falsework has a higher potential danger since these practical constructions are usually ignored in the falsework structural design. The research is a two-year project.
- From these analysis results, the author drew conclusions which are very useful to understand the mechanical capacity of the falsework system and guide the engineering practice.
- In the UK, BS 5975 gives recommendations for the design and use of falsework on construction sites.
- The erection of the Hell Gate was carried through without the assistance of any falsework, or work that was not part of the actual bridge.
- Instead of excavating and then building falsework before casting the superstructure of the bridge, the contractor chose to build it supported by the ground, and then excavate underneath.
- This span would be built without falsework, employing two cantilevered arms and a suspended arm.
- Unable to construct falsework to erect the arches, because they would obstruct river traffic, Eads's engineers devised a cantilevered rigging system to close the arches.
Similar words: False Bottom, Falltime, Fall About, Falu, Fall Short, False Face, Fall To The Ground, Fallot, Fallen Asleep, Falckenstein, Falckenberg, Falus, Falbala, Falces, Fallopian Tubes, Falster, False Start, Fall Through, Fallieres, Faliero